/ASIC fabrication/MPW Schedules 2023

MPW Schedules 2023

Imec.IC-link offers the Multi-Project Wafer (MPW) services through leading foundries and fabs. Find out the scheduled runs below.

If you are interested in small ASIC designs, we can offer you a service called the mini@sic via EUROPRACTICE.

Please, feel free to contact us if you have any questions.

UMC

UMC schedule 2023

Important notes:

TSMC schedule 2023
  • Dates are GDS submission deadlines.
  • Several TSMC shuttles are extremely loaded. For any technology, please make your design registration as early as possible. We will work with you and do our best to get your design on the run. If required, a waiting list will be created.
  • The TSMC run schedule for the second half of 2023 will be published in late March. We will share it with you as soon as it is available.
  • Bumping is available upon request for all 12-inch technologies.
  • Contact eptsmc@imec.be if any of the following options are used: Bumping, MTP/OTP, Deep Trench, High Linearity MiM, Schottky Barrier Diode, ULL N/PMOS.

Imec

Si photonics schedule

Important notes:

  • Dates indicate deadlines for submission of the first version of the GDS file.
  • Registration for a given shuttle closes 1 month before the dates indicated on the table.
GaN schedule

Important notes:

  • Dates indicate deadlines for submission of the first version of the GDS file.
  • Registration for a given shuttle closes one month before the dates indicated on the table.

X-FAB

XFAB

Important notes:

  • Dates are GDS submission deadlines. Registration should be done at least 2 weeks in advance.
  • Additional technology options are available: download pdf.
  • *In case of cancellation, there is a possibility to order these technologies by MLM.